Table of Contents

  1. SLIs, SLOs and error budgets
  2. Alerting that doesn't burn out on-call
  3. Incident management
  4. Blameless postmortems
  5. Safe change: rollouts, flags, migrations
  6. Capacity planning and load
  7. Resilience patterns
  8. Multi-region and cell-based architecture
  9. Interview questions

1. SLIs, SLOs and error budgets

  • SLI (indicator): a measured ratio of good events to total events. Example: requests with status < 500 and latency < 300 ms / all requests.
  • SLO (objective): the target for an SLI over a window. Example: 99.9% over 30 days.
  • SLA (agreement): a contractual promise with consequences, always looser than the internal SLO.
  • Error budget = 1 − SLO. At 99.9% over 30 days: 0.1% × 43,200 min ≈ 43 minutes of full downtime-equivalent.
SLO (30 days) Allowed downtime
99% ~7.2 h
99.9% ~43 min
99.95% ~22 min
99.99% ~4.3 min

Choose SLIs from the user's view: availability (successful requests), latency (a percentile threshold, never the mean), freshness (data age), correctness (right answer), durability. Measure at the edge (load balancer or client), not only inside the service.

Using the budget: when budget remains, ship faster and take risks; when it's exhausted, freeze risky launches and spend time on reliability. This turns "reliability vs. features" from an argument into a policy agreed in advance with product.

Dependencies: availability multiplies along serial dependencies. A service with 99.9% SLO that hard-depends on three 99.9% services can deliver at best ≈ 99.6%. Make dependencies soft (fallbacks, caching, async) wherever you can.

Pick SLOs deliberately: each extra nine costs roughly 10× more. Users can't tell 99.99% from 99.9% if their own network is 99.5%.


2. Alerting that doesn't burn out on-call

Alert on symptoms (user pain), not causes. Page on "error budget burning fast," not "CPU > 80%." Causes go on dashboards and low-urgency tickets.

Multi-window, multi-burn-rate alerts (from the Google SRE workbook) catch both fast and slow burns. Burn rate = how many times faster than sustainable you're consuming budget. Typical for a 30-day SLO:

Severity Burn rate Long window Short window Budget consumed
Page 14.4× 1 h 5 min 2%
Page 6× 6 h 30 min 5%
Ticket 1× 3 days 6 h 10%

The short window makes the alert reset quickly once fixed; the long window prevents flapping.

Every page must be: actionable, urgent, real, and tied to a runbook. If it fires and the on-call does nothing, delete or demote it. Track pages per shift; sustained more than ~2 per 12-hour shift is a reliability problem, not a staffing one.


3. Incident management

Severity and roles

Role Responsibility
Incident Commander (IC) Owns the response; assigns work; makes calls; does not debug
Ops / Tech lead Hands-on investigation and mitigation
Communications lead Status page, stakeholder updates on a fixed cadence (e.g. every 30 min)
Scribe Timeline in real time (for the postmortem)

The loop

  1. Detect: alert, customer report, or anomaly.
  2. Triage: impact, scope, severity. Declare early; you can downgrade.
  3. Mitigate first: rollback, disable the flag, fail over, shed load, scale out. Restore service before finding the root cause.
  4. Communicate: internal channel, status page, executive summary; say what you know, what you don't, and when the next update is.
  5. Resolve and verify: confirm with SLIs, not just "the graph looks better."
  6. Learn: postmortem within a few days; track action items to completion.

Heuristics: "What changed?" is the most productive first question (deploys, config, flags, traffic, dependencies, certificates, quotas, clock/date). If a recent change correlates, roll it back before understanding it. Don't make several changes at once; you lose causality. Hand off cleanly on long incidents; tired responders make errors.

Figure: the incident loop. Mitigate before root cause, then learn.

flowchart LR
  A[Detect] --> B[Triage: impact and severity]
  B --> C[Mitigate first]
  C --> D[Communicate on cadence]
  D --> E[Resolve and verify with SLIs]
  E --> F[Postmortem and action items]
  C -. "what changed?" .-> G[Rollback or disable flag]
  G --> E

4. Blameless postmortems

Blameless means we look for how the system let a reasonable person make that mistake, not who to punish. People who fear blame hide information.

Structure:

# Postmortem: <short title>   (Severity, date, duration, author)
## Summary         what happened, impact (users, revenue, SLO budget burned), in 3-4 sentences
## Impact          numbers: affected requests/users, duration, data loss?
## Timeline        UTC timestamps: detection, escalation, mitigation, resolution
## Root cause(s)   the chain of conditions; use "5 whys" but stop at systemic causes
## Detection       how did we find out? how could we find out faster?
## What went well / what went poorly / where we got lucky
## Action items    each with owner, priority, due date, and type:
                   prevent (stop recurrence), detect (find faster), mitigate (reduce impact)

Quality bar: action items are specific and owned ("add a canary stage that gates on error rate," not "be more careful"); human error is never the root cause; "where we got lucky" is included; the doc is shared widely; action items are tracked to completion (the usual failure).


5. Safe change: rollouts, flags, migrations

Most outages are caused by change. Make change small, gradual, observable, and reversible.

Progressive delivery

  • Canary: route 1–5% to the new version, compare SLIs against the baseline automatically, promote or roll back.
  • Staged regions/cells: one cell, then a region, then the rest. Never deploy everywhere at once.
  • Blue/green: instant switch back; costs double capacity during the cutover.
  • Feature flags: decouple deploy from release; kill switch for risky paths. Clean up stale flags; every flag is a branch you must test.
  • Shadow traffic / dark launch: send real traffic to the new path and compare results without affecting users.

Backward-compatible changes (expand / contract)

For schemas and APIs, never make a breaking change in one step:

  1. Expand: add the new column/field/endpoint; old code ignores it.
  2. Dual-write to old and new; backfill history.
  3. Verify: compare old vs. new (counts, checksums, sampled reads).
  4. Switch reads to new, gradually, behind a flag.
  5. Stop writing old; observe.
  6. Contract: remove the old column/field after a safe window.

Figure: expand/contract migration, each step independently deployable and reversible.

flowchart LR
  A[Expand: add new field] --> B[Dual-write and backfill]
  B --> C[Verify old vs new]
  C --> D[Switch reads gradually]
  D --> E[Stop writing old]
  E --> F[Contract: remove old]

Every step must be deployable and rollback-able independently. Code must tolerate both versions running at once (rolling deploys guarantee that).

Migration playbook

Define the end state and the reason; make the new path the easy path; migrate by cohort with a tracked dashboard; keep rollback until the old path is idle; delete the old system and its dashboards, alerts, and docs. Most migrations stall at 90% because deletion has no owner.

Dangerous operations checklist

Config changes and certificate expiry are deploys too. Treat them with the same rollout. Require two-person review for destructive actions; use dry-run modes; keep backups and test restores (a backup you've never restored is a hope, not a backup).


6. Capacity planning and load

  • Know the bottleneck resource for each service (CPU, memory, connections, disk IOPS, a downstream limit) and its saturation point from load tests.
  • Headroom: run at ≤ 50–60% of tested capacity at peak so you can absorb a node/AZ loss (N+1 or N+2) and traffic surprises.
  • Forecast from growth trends plus planned launches; review quarterly; include lead times (procurement, quota increases, cloud limits).
  • Autoscaling helps with gradual change but not with spikes faster than scale-up time or with stateful/cold-start-heavy services. Pre-warm for known events.
  • Load test in production-like environments with realistic data shapes; include failure scenarios (a node down at peak).
  • Queueing intuition: latency grows non-linearly as utilization approaches 100% (for an M/M/1 queue, waiting time scales as ρ / (1 − ρ)). At 90% utilization, expect roughly 9× the service time in queue; at 95%, ~19×. This is why "it's only 90% CPU" is not fine.
  • Cost: tag by team and service; the biggest costs are usually data egress, over-provisioned stateful stores, and logs/metrics cardinality.

7. Resilience patterns

Pattern Purpose Gotcha
Timeouts (everywhere) Bound the damage of a slow dependency Set below the caller's own deadline; propagate the deadline
Retries with backoff + jitter Survive transient errors Only idempotent ops; cap with a retry budget to avoid storms; retry at one layer only
Circuit breaker Stop calling a failing dependency; let it recover Needs a sensible half-open probe; tune per dependency
Bulkheads Isolate resource pools so one failure can't exhaust all Cost: lower utilization
Load shedding Reject excess work early to protect latency for the rest Prioritize (critical over background); fail fast with 429/503
Backpressure Make producers slow down Needs end-to-end propagation; unbounded queues hide the problem
Graceful degradation Serve a reduced experience (cached/stale/simplified) Define and test the degraded modes
Idempotency Make retries and duplicates safe Keys and storage lifetimes
Hedged requests Cut tail latency by sending a second request after a delay Extra load; only for idempotent reads
Static stability Data plane keeps working when control plane is down Pre-provision capacity; no hot-path dependency on control plane

Metastable failures: systems that stay broken after the trigger is gone (e.g. retry storms and cache-miss stampedes keep load above capacity). Defend with load shedding, retry budgets, jittered TTLs, and the ability to drain traffic to recover.


8. Multi-region and cell-based architecture

Multi-region options

Model RTO / RPO Complexity Notes
Backup & restore hours / hours Low Cheapest; for non-critical systems
Pilot light tens of minutes / minutes Medium Data replicated, compute scaled up on failover
Warm standby minutes / seconds Medium-high Reduced-capacity copy always running
Active-active ~0 / ~0 Very high Needs conflict resolution or a data model that avoids conflicts (partition users to a home region, CRDTs)

Questions that decide it: what's the real RTO/RPO the business needs? Where does consistency matter (money, inventory) versus where eventual is fine? What's the cost of the added complexity and the risk of bugs in failover itself? Test failover regularly; an untested failover plan fails.

Cell-based architecture

Partition the system into independent cells, each a complete stack serving a subset of customers. A thin router maps customer → cell.

  • Blast radius: a bad deploy or poison request affects one cell (e.g. 1/20 of customers), not everyone.
  • Scalability: add cells instead of scaling unbounded shared components.
  • Safer rollouts: deploy cell by cell.
  • Costs: routing layer becomes critical (keep it simple and static-stable); cross-cell queries and operations are harder; capacity is fragmented.

Figure: a thin router maps each customer to one cell, so a bad deploy hits only that cell.

flowchart TB
  R[Cell router: customer to cell]
  R --> C1[Cell 1: full stack]
  R --> C2[Cell 2: full stack]
  R --> C3[Cell N: full stack]
  C1 --> D1[(Data 1)]
  C2 --> D2[(Data 2)]
  C3 --> D3[(Data N)]

Shuffle sharding

Assign each customer a random small subset of workers; a noisy or poisonous customer can only hurt the few workers it maps to, and two customers rarely share the same subset. Dramatically reduces the chance that one customer's problem takes out another.


9. Interview questions

Q1. "Define an SLO for a checkout API and how you'd use it." SLI: fraction of checkout requests that return non-5xx within 800 ms, measured at the load balancer. SLO: 99.95% over 30 days (~22 min of budget). Alert on multi-window burn rate. Budget policy: if >50% is burned mid-window, only reliability work and low-risk changes ship until it recovers. Review quarterly against user-visible impact.

Q2. "You're paged: error rate spiked. Walk me through the first 15 minutes." Declare an incident and assign an IC if impact is real; assess scope (which endpoints/regions/customers). Ask what changed (deploys, flags, config, traffic, dependencies). If a change correlates, roll it back immediately. Otherwise mitigate by shedding load or failing over. Start comms with a cadence. Preserve evidence (logs, a profile) before restarting things. Root cause comes after service is restored.

Q3. "How do you reduce on-call burden for a noisy service?" Measure (pages per shift, top alert sources, time-to-resolve), then fix the top offenders: delete non-actionable alerts, convert cause-based alerts to SLO burn alerts, automate the top runbook steps, fix the underlying defects (toil is a bug), and protect on-call with an explicit budget (e.g. ≤ 25% of time on interrupts) with leadership backing.

Q4. "How would you migrate a critical table to a new schema/store with zero downtime?" Expand/contract: add the new store; dual-write behind a flag; backfill with checkpointing and throttling; verify with continuous diffing; shift reads by percentage; hold dual-write while rollback remains possible; cut writes; retire the old store. Plan for failures at each step, ownership of deletion, and a clear rollback trigger.

Q5. "Active-active multi-region: would you do it?" Only if the business RTO/RPO truly require it and the data model can support it (per-user home region, idempotent/commutative operations, CRDTs, or accept conflicts). The cost is complexity and a new class of bugs; many systems are better served by warm standby with a tested failover. Decide per data type: money may need single-writer, while presence or counters can be multi-writer.

Q6. "What's a metastable failure and how do you defend against it?" A state where a sustaining feedback loop (retries, cache misses, queue buildup) keeps the system overloaded after the original trigger is gone. Defenses: load shedding and admission control, retry budgets and jittered backoff, circuit breakers, bounded queues, request deadlines propagated downstream, and operational levers to drain or throttle traffic during recovery.

Q7. "How do you know a canary is healthy?" Compare the canary against a concurrent baseline (not last week) on SLIs: error rate, latency percentiles, saturation, and business metrics. Require minimum traffic and duration, statistically meaningful differences, and automatic rollback on breach. Include a bake time long enough to hit slow failure modes (memory leaks, cache effects, daily cycles).

Q8. "Postmortem action items keep not getting done. What do you change?" Make them few and high-leverage, with named owners and dates, in the normal tracker; review completion in a recurring ops review; report overdue items to leadership; reserve capacity; and distinguish prevent/detect/mitigate so the team funds the highest-value ones rather than writing a long list nobody owns.